2026 Infrastructure Improvements

Project Information:
At the March 23, 2026 City Council meeting, a contract was awarded to Northwest Asphalt for the 2026 street infrastructure improvements. This project will begin in June 2026. Residents on streets impacted by project improvements will receive further details in the mail. 

The project maps shown below identify streets scheduled for either a reclaim and overlay, or mill and overlay pavement improvements.

Reclaim and Overlay Pavement Improvements:
A reclaim and overlay is a type of pavement improvement that involves grinding down the entire pavement section of the roadway down to the underlying gravel base. Roadways will remain gravel while the contractor performs subgrade repairs on the road base. Roadways will then be re-paved with a full new section of pavement.

Mill and Overlay Pavement Improvements:
A mill and overlay is a type of pavement improvement that involves removing only the top two to three inches of pavement. Roadways will still have a paved driving surface while the contactor performs subgrade repairs on the underlying asphalt. Following subgrade repairs to the underlying asphalt, the road will be re-paved.

Image showing project area in Saint Raphael neighborhoodImage showing project area on Nevada Ave NImage showing project area on Zealand Ave NImage showing project area on 62nd Ave N and in Meadow Lake neighborhood


Water Valve Replacements & Water Shut-offs
 
There are several water valves and hydrants scheduled for replacement as part of this project. Water valves and or hydrants will be added or replaced near the following intersections:

  • Zealand Ave N/Bass Lake Rd
  • Pennsylvania Ave N/53rd Ave N
  • Nevada Ave N/45th Ave N

Residents near these locations may be impacted by a water shut off while these replacements take place. Impacted residents will receive notification 48 hours ahead of time.

Curb Replacements
Isolated sections of curb and gutter will be replaced as part of this project. The project engineering firm Stantec will be evaluating and marking curbs that are under consideration for replacement. Residents impacted by curb replacements will be notified to relocate irrigation and landscaping located in the city right of way that may be impacted by the curb replacements.

Drainage Improvements
There are several areas scheduled for stormwater system improvements. Drainage improvements are planned near the following intersections:

  • Nevada Ave N/45th Ave N
  • Angeline Dr/Rhode Island Ave N
  • 59th Ave N/Wisconsin Ave N
  • 62nd Ave N (various locations)

Project Contact:
Nick Macklem, Project Coordinator
Phone: 763.592.6765
Email: [email protected] 

Private Utility Project Information:
Details on the recent CenterPoint Energy gas line project can be found at the following link to their project website.