Water Valve Replacements & Water Shut-offs
There are several water valves and hydrants scheduled for replacement as part of this project. Water valves and or hydrants will be added or replaced near the following intersections:
- Zealand Ave N/Bass Lake Rd
- Pennsylvania Ave N/53rd Ave N
- Nevada Ave N/45th Ave N
Residents near these locations may be impacted by a water shut off while these replacements take place. Impacted residents will receive notification 48 hours ahead of time.
Curb Replacements
Isolated sections of curb and gutter will be replaced as part of this project. The project engineering firm Stantec will be evaluating and marking curbs that are under consideration for replacement. Residents impacted by curb replacements will be notified to relocate irrigation and landscaping located in the city right of way that may be impacted by the curb replacements.
Drainage Improvements
There are several areas scheduled for stormwater system improvements. Drainage improvements are planned near the following intersections:
- Nevada Ave N/45th Ave N
- Angeline Dr/Rhode Island Ave N
- 59th Ave N/Wisconsin Ave N
- 62nd Ave N (various locations)